The Bayshore Condominiums

Heating System Will Be Turned On – Important Info

Please note, DCC 19 heating system will be turned on:

FRIDAY, OCTOBER 14th, 2016.

Usually when the heat is turned on, some heating components leak. Each unit has one (1) heating component which is usually found in the first bedroom, at the right or left side of the Radiator. The “01” unit component is usually found in the master bedroom.

Residents are reminded to place a container under the heating component to prevent water leak/damage that may occur and monitor for leaks. As done in the past, residents can pick up 1 aluminum dish (1 per unit) from the office.

Please remember to check your heating system components regularly throughout the heating season and  immediately report any sign of water leaks to the Superintendents:

Gino @ 905-424-1566 – Monday to Friday
Sylvan @ 905-424-5173 – weekends and holidays

NOTE: It is very important to remove air conditioners from all windows to prevent heat loss and frozen pipes.

PLEASE NOTE DCC 19, WILL NOT ACCEPT RESPONSIBILITY FOR PROPERTY DAMAGE RESULTING FROM RESIDENTS NEGLIGENCE.

Thank you.

Sandra, Property Administrator
DCC 19